ANKARA HILTON HOTEL TRIGENERATION INSTALLATION

ANKARA HILTON OTELİ TRİJENERASYON MONTAJI

Client: Borusan Endüstriyel Sistemler A.Ş. Scope: Installation of Acoustic Cabinets and Ventilation Systems for CAT Gas Generators Location: Ankara/TURKEY Project Start: 06.2017 Project End: 08.2017

BILKENT INTEGRATED HEALTH CAMPUS

BİLKENT ENTEGRE SAĞLIK KAMPÜSÜ

Client: Borusan Endüstriyel Sistemler A.Ş. Scope: Installation of Fire Protection Systems for the Trigeneration Building and Ventilation Systems for CAT Gas Generators Location: Ankara/TURKEY Project Start: 12.2016 Project End: 02.2017

TAYSEB 2500-PERSON CAFETERIA

TAYSEB 2500 KİŞİLİK YEMEKHANE

Client: Toros Tarım Sanayi Ticaret A.Ş. Scope: Installation of Heating, Ventilation, and Air Conditioning Systems for a 2500-person cafeteria and kitchen Location: Ceyhan/ADANA/TURKEY Project Start: 06.2019 Project End: 12.2019

BALIKESIR UNIVERSITY TECHNOKENT BUILDING

Maki Mühendislik - Balıkesir Üniversitesi Teknokent Binası

Client: Milenyum Yapı İnşaat Sanayi ve Ticaret Limited Şirketi Scope: Installation of Heating-Cooling, Ventilation, Fire Protection, and Sanitary Systems for the Technopark Building Location: Balıkesir/TURKEY Project Start: 06.2018 Project End: 03.2019

TAYSEB (TOROS ADANA YUMURTALIK FREE ZONE)

Maki Mühendislik - Tayseb

Client: Toros Tarım Sanayi Ticaret A.Ş. Scope: Complete Facility Fire System Installation (Fire water pressurization, distribution, and hydrant system installation) Location: Ceyhan/ADANA/TURKEY Project Start: 12.2019 Project End: 06.2020

MEFA NERISSA

Client: Mefa Grup A.Ş. Scope: Installation of Heating-Cooling, Ventilation, Fire Protection, Sanitary Installation, and Fire Detection & Alarm Systems for a 36-story residential project Location: Mersin/TURKEY Project Start: 11.2022 Project End: 06.2025

TOROS TARIM MERSİN PRODUCTION FACILITY

TOROS TARIM ÜRETİM TESİSİ

Client: Toros Tarım Sanayi Ticaret A.Ş. Scope: Complete Facility Fire System Installation Fire water pressurization, distribution, and hydrant system installation Installation of Fire Protection Systems for Ammonia Tanks Fire Detection and Alarm System Installation Location: Mersin/TURKEY Project Start: 05.2024 Project End: 01.2025